Procédés

Analysis of manufacturing times

Pré-requis : Process Concepts for Feed Mills

Public de la formation

Operators, Plant Manager, Manufacturing manager, Maintenance Manager, Quality Manager, Investment Manager, Leader, Continuous Improvement
  • Identify the steps involved in designing a time analysis project
  • Mastering the techniques of constructing and analyzing a time diagram
  • On-site training
  • Presentation/Exchanges/In-room synthesis
  • Practical exercise with scenario
  • A hard copy is provided at the end of the training

Programme de la formation

  • Presentation of a time analysis methodology
  • Definition of industrial performance indicators for use in animal nutrition
  • Construction and analysis of a time diagram
  • Practical exercises of exploiting a time diagram: measurement of productivity indicators, search for the limiting factor

Modalités d'évaluation et de suivi

  • Questionnaire on the trainee’s expectations to be completed before training, then 3 months after to take stock of the evolution of practices
  • Educational evaluation in the form of a MCQ at the end of the session

Formateurs

François Lucas

Les tarifs

Members – 670.00 € HT (806.40 € TTC) ; Non-members: 938.00 € HT (1 125.60 € TTC) ; Tariff Intra contact us

Je souhaite recevoir des informations

De la formation standard à la formation sur-mesure, n’hésitez pas, nous sommes là pour vous conseiller.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.