Refroidisseur

Cooling

Pré-requis : Process Concepts for Feed Mills

Public de la formation

Industrial Manager, Team or Production Manager, Maintenance
  • Identify the mode of operation of coolers
  • Integrate coolers performance criteria
  • Identify key levers to optimize the cooling operation
  • Ability to identify coolers strengths/weaknesses
  • Face-to-face training
  • Observations and practices in the workshop
  • In-room presentation and synthesis phases
  • Exchange of experiences between participants
  • A hard copy is provided at the end of the training

Programme de la formation

  • Relationship of coolers with other operations
  • Cooling/coolers in the die
  • Drying/Cooling – Aeraulic Base
  • Performance check
  • Driving parameters
  • Implementation of a diagnostic tool

Modalités d'évaluation et de suivi

  • Questionnaire on the trainee’s expectations to be completed before training, then 3 months after to take stock of the evolution of practices
  • Educational evaluation in the form of a MCQ at the end of the session

Formateurs

Sandy Rouchouse

Les tarifs

Members – 670.00 € HT (806.40 € TTC) ; Non-members: 938.00 € HT (1 125.60 € TTC) ; Tariff Intra contact us

Je souhaite recevoir des informations

De la formation standard à la formation sur-mesure, n’hésitez pas, nous sommes là pour vous conseiller.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.